The Cellnex datacenter in Goes is housed in the oldest radio and television mast in the Netherlands, built in 1957 to provide nationwide broadcasting. Today, this historic tower hosts Cellnex’s sixth and one of their largest datacenters, combining heritage with modern technology.
Designed compactly and modularly, the datacenter’s small floors allow constant integration of the latest technologies, ensuring flexibility to meet varied customer needs and future growth.
Each data floor covers 50 m², with a total of 550 m² of whitespace. The facility offers a fully built-out power capacity of 1.05 MW (1050 kVA), with rack power ranging from 1 to 20 kVA. Power supply is delivered via dual A and B feeds, supporting voltages of 230V and 400V, with 48V available on request.
The Goes datacenter operates with a PUE value under 1.2, is 100% powered by sustainable Dutch wind energy, and uses direct free air cooling to maximize energy efficiency.
Security measures include CCTV surveillance, biometric access, and card access control. Flexible space options include full cabinets, partial cabinets, shared rackspace, and cages, with remote hands available for on-site assistance.
Our Colocation Plans
Full Rack
- Rack Space46U Full Locking Cabinet
- Power LimitUp to 240V
- Bandwidth1Gbps Unmetered
- Uplink / Port1Gbps Network Uplink
- ManagementKVMoIP & Server Panel
- Support5hrs Free Remote Hands / mo
Custom Solutions
- Rack SpaceMulti-Rack or Private Cage
- Power LimitCustom (Up to 240V+ Phased)
- BandwidthCustom Uplinks (1Gbps+)
- Uplink / PortDark Fiber & Direct Connects
- ManagementDedicated Account Manager
- Support24/7 Priority Remote Hands
Why Choose Goes Dc 1
Goes Dc 1 data center is built to meet the demands of modern enterprises, offering robust infrastructure, premium connectivity, and top-tier security. Whether you're deploying a single server or scaling to multiple racks, each facility is engineered for performance, reliability, and flexibility.
Tier III Certified
Redundant infrastructure with 99.99% uptime guarantee
Premium Connectivity
Multiple carrier options and low-latency connections
Advanced Security
Biometric access, 24/7 monitoring, and CCTV surveillance
Prime Location
Central Goes location with excellent transport links
Expert Support
Local technical team available 24/7 for remote hands
Scalable Solutions
From single rack to private cage configurations
Technical Specifications
Comprehensive infrastructure details for Goes Dc 1
Total Critical Power
1.05 MWIndicates the maximum uninterrupted power capacity the facility can support during operation.
Max Power Rack
20 KWSpecifies the maximum power allocation per rack, ensuring high-density deployments.
CCTV Surveillance
Monitors premises in real-time for safety and compliance.
Biometric Access Control
Secures critical areas with fingerprint or retinal scanning systems.
Card Access Control
Allows controlled entry through RFID or magnetic access cards.
Total Whitespace
550 Sq.m.Indicates available raised floor space for IT infrastructure.
Key Performance Metrics
Want to get a custom quote?
Interested in this facility? Reach out to our team for specific pricing and availability.
Sales:
Take the first step and contact us. We begin every new conversation with a thorough vetting process to ensure we understand your needs and goals. This helps us align our products and services with your definition of success.