Datacenter Image
Proezd 683, 8 124527 Zelenograd Russia
CloudMTS

MTS's GreenBushDC in Moscow is a Tier III certified datacenter. Operational since 2018, this purpose-built facility stands out for its commitment to efficiency and reliability. It offers flexible services including colocation (full cabinets, partial cabinets, shared rackspace, cages, and suites), virtual storage solutions, and remote hands support, all focused on scalability for businesses in Russia.

Facility Size and Power

The total building size is 18,800 sq.m., situated on a total plot size of 20,000 sq.m. across 3 floors. The datacenter features a fully built-out whitespace of 4,400 sq.m. It has a fully built-out power capacity of 21 MW, supporting a maximum power density of 20 kW/rack.

Cooling and Suppression

The facility's cooling system boasts N+1 redundancy and uses a liquid cooling system based on chillers and precision air conditioners in modulus A2. For fire suppression, it uses an Automatic Fire Suppression System based on the NOVEC-1230 gas suppression system.

Security and Connectivity

GreenBushDC maintains robust physical and network security protocols, holding DSS PCI Certified status. Physical security measures include a fenced perimeter, CCTV surveillance, Biometric Access Control, and Card Access Control. The datacenter prioritizes high-speed connectivity by offering diverse carrier options to ensure seamless data transfer.

Our Colocation Plans

Data Center Server Racks

Why Choose Moscow Dc 49

Moscow Dc 49 data center is built to meet the demands of modern enterprises, offering robust infrastructure, premium connectivity, and top-tier security. Whether you're deploying a single server or scaling to multiple racks, each facility is engineered for performance, reliability, and flexibility.

Tier III Certified

Redundant infrastructure with 99.99% uptime guarantee

Premium Connectivity

Multiple carrier options and low-latency connections

Advanced Security

Biometric access, 24/7 monitoring, and CCTV surveillance

Prime Location

Central Moscow location with excellent transport links

Expert Support

Local technical team available 24/7 for remote hands

Scalable Solutions

From single rack to private cage configurations

Technical Specifications

Comprehensive infrastructure details for Moscow Dc 49

Total Critical Power

21 MW

Indicates the maximum uninterrupted power capacity the facility can support during operation.

Max Power Rack

20 KW

Specifies the maximum power allocation per rack, ensuring high-density deployments.

Cooling Redundancy

N+1

Maintains optimal temperatures through backup cooling systems.

Automatic Firesuppression

Instantly detects and suppresses fires without manual intervention.

Fire Suppression System

Provides a comprehensive system to control or extinguish fires automatically.

Fenced Perimeter

Enhances physical security with a secure perimeter barrier.

CCTV Surveillance

Monitors premises in real-time for safety and compliance.

Biometric Access Control

Secures critical areas with fingerprint or retinal scanning systems.

Card Access Control

Allows controlled entry through RFID or magnetic access cards.

Total Whitespace

4,400 Sq.m.

Indicates available raised floor space for IT infrastructure.

Total Building Size

18,800 Sq.m.

Total structural area of the facility housing all infrastructure.

Parking Available

Available

Office Space

On-premises workspace for clients or partners.

Key Performance Metrics

99.99%
Uptime SLA
21 MW
Total Power
100%
Secure Monitoring

Compliance & Certifications

Tier 3
Uptime Institute (Design)
Tier 3
Constructed Facility
PCI DSS
PCI DSS
Certified

Want to get a custom quote?

Interested in this facility? Reach out to our team for specific pricing and availability.

contact us vector

Sales:

Take the first step and contact us. We begin every new conversation with a thorough vetting process to ensure we understand your needs and goals. This helps us align our products and services with your definition of success.

[email protected]